What We Do

Services

Every job we quote breaks down into one or more of these.

Home › Services

Everything we take on

Every job below is one we do ourselves across Ontario.

Deck Installation

We frame new decks on concrete footings poured below grade, sized for the Inland Empire's clay soil so posts don't heave after a wet winter. Joists run 16 inches on center for wood decking and tighter for composite. We handle everything from a simple rectangle off the back door to a deck that wraps around the side of the house.

Custom Deck Design

Some yards have a slope, a pool equipment pad, or a tree nobody wants cut down, and the deck has to work around it. We sketch the layout with you first, figure out where the stairs land and how the railing lines meet at the corners, before any lumber gets ordered. Multi-level decks and built-in bench seating both start here.

Deck Repair

A deck that bounces when you walk across it usually has an undersized beam or a shifted post footing, not a problem with the decking itself. We pull boards to check the joists and ledger connection before we quote anything, because patching the surface over bad framing just hides the problem for a year. Rot at the ledger board, where the deck bolts to the house, is the most common repair we see.

Deck Staining & Sealing

Wood decking out here takes a real beating from UV, not just rain, and it'll gray and check within a year or two if it's left bare. We pressure wash, let the wood dry for a couple of days, then apply a penetrating stain and sealer rather than a film-forming paint that just peels later. Plan on redoing this every two to three years depending on sun exposure.

Composite Decking Installation

Composite boards don't require staining, but the framing underneath still has to be built to spec, including tighter joist spacing since composite sags more between supports than real wood does. We install with hidden fastener clips so there are no screw heads showing on the surface. It costs more up front than pressure-treated pine and you never touch it again.

Deck Railing Repair

A railing that wobbles is almost always a loose post connection, not a problem with the balusters. We re-bolt posts to the framing with structural screws instead of the deck screws that were probably used the first time. Baluster spacing has to stay under 4 inches for code, and we check that on every repair even if nobody asked.

Deck Resurfacing & Board Replacement

If the framing underneath is solid but the decking boards are cupped, splitting or full of popped nails, we strip the old boards and install new ones on the existing structure. This is usually faster and cheaper than a full rebuild. It's a good option for a deck that's ten to fifteen years old with framing that still checks out.

Multi-Level Deck Building

Sloped yards usually need more than one deck level connected by a short run of stairs. Each level needs its own beam and footing layout, and the stair stringers have to land on solid footings too, not just hang off the deck frame. We've built these on lots where the drop from the back door to the yard is five feet or more.

Pergolas & Deck Covers

A lot of deck jobs around Ontario end with a pergola or shade structure, because an uncovered deck gets too hot to use most summer afternoons. We attach these to the deck framing directly, not just set posts in the ground next to it, so the whole structure moves as one unit. We can match the wood or composite trim to the deck itself.

Deck Demolition & Removal

Sometimes the old deck has to come out before anything new goes in, especially if the footings are in the wrong spot for the new design. We haul off the old lumber and sweep the yard for nails and screws before digging new footings. This is usually priced as part of a rebuild rather than billed separately.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Ontario, CA

Available for deck projects throughout Ontario and the surrounding cities below.

Ontario, CA
Riverside, CA
San Bernardino, CA
Fontana, CA
Moreno Valley, CA
Rancho Cucamonga, CA
Corona, CA
Pomona, CA
Chino, CA
Upland, CA
Chino Hills, CA
Redlands, CA
Common Questions

Things worth asking

Questions that come up once a deck project actually gets going.

Do I need a permit to build a deck?
Most decks attached to a house, or any deck more than 30 inches above grade, require a building permit in California. Permit review typically covers footing depth, joist spans, and guard rail height. Pulling the permit and scheduling inspections is normally handled as part of the job.
How long does a typical deck build take?
A basic ground-level deck usually takes one to two weeks from the first footing to the final board. A multi-level deck with stairs, railing, and a pergola can run three to five weeks, partly depending on permit inspection scheduling.
Can a deck be built to a specific budget?
A budget figure can shape material choice and deck size, whether that means pressure-treated pine instead of composite or a simpler railing style. Framing and footings are never the place to cut corners, so budget adjustments usually come from material or size instead.
Do you guarantee your deck work?
Workmanship is typically covered under warranty for a set period after completion, with the details written into the quote. Material warranties on composite decking are separate and come from the manufacturer, often 25 to 50 years against fading and staining.
Who will I actually be dealing with during the project?
A single point of contact usually handles the whole job, often the same person who provided the quote. Homeowners are not typically passed between a salesperson and a crew they never met.
What decking materials are available?
Pressure-treated pine, cedar, redwood, and composite decking from brands like Trex and TimberTech are all common choices. Pine costs less upfront but requires regular staining, composite costs more but stays low-maintenance for decades.
Can I still use my yard while the deck is being built?
Partly. The work area gets fenced off for safety, especially once footings are being dug, but the rest of the yard typically stays usable. Water and power to the house are not affected.
How should I prepare the site before work starts?
Clearing furniture, planters, and anything breakable away from the existing deck or patio area ahead of time helps the crew start on schedule. Flagging any gate or side yard access that will be used for material delivery is also useful.
What happens if rot or damage turns up once the old deck comes off?
This comes up often on resurfacing jobs, usually at the ledger board or around post bases. Work stops, the damage gets shown to the homeowner, and additional framing repair gets quoted before moving forward rather than building over the problem.
How should a finished deck be maintained?
Wood decking should be cleaned and re-sealed every two to three years depending on sun exposure. Composite decking just requires an occasional hose-down and soap scrub to keep mildew from building up in shaded corners.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (909) 479-3870